Campbell Met One 034A-L Manuale dell'Operatore Pagina 42

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 75
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 41
42
Installation, Operation and Maintainance of Automatic Meteorological Stations
Tripod
Construction of the tripod is a straightforward process. Foundation blocks with a solid embedded anchoring bold
should be constructed at each 120 degrees of a circle with diameter of 2.4 meter. Place the tripod feet (no. 9) on
these bolds and attach the nuts firmly.
Annex 10 presents detailed instructions for constructing the tripod.
Although all items are made out of galvanized steel, which should not rust, it is advised to paint the upper and
lower body (items 5 and 7), and upper and lower legs (items 10 and 11). First apply a coating of zinc chromatic primer,
then a layer of final paint. As all the remaining items are supplied by Campbell Scientific and made out of the best
quality galvanized steel, there should be no need to paint them. However, if the environmental conditions in the
region would provoke corrosion of these components, they should be painted according to the above guidelines.
5.3 Maintenance
Maintenance to the tripod is limited to periodically checking if all bolds and nuts are firmly attached (tighten when
required) and removing corrosion and repainting if necessary.
Vedere la pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 74 75

Commenti su questo manuale

Nessun commento